Description
Stellar by Elie Saab is an ultra-luxury branded residential development by Emirates Developments on Yas Island, Abu Dhabi. The supplied material places it near the waterfront and landscaped greenery, with access to the island’s entertainment, dining and leisure destinations. The project is described as comprising a residential tower and integrated podium and garden residences; market materials cited in the source report approximately 144 units, with the total and breakdown varying by layout source.
The design direction draws on ELIE SAAB Maison. Described material details include light oak, white travertine and bronzed accents. The reported residence offering includes one- to four-bedroom apartments, multi-bedroom garden villas and penthouses. One-bedroom apartment layouts are reported at approximately 758 to 1,361 sq ft, while published project layouts overall are stated to range from about 758 sq ft to 7,843 sq ft across apartments, villas and penthouses. These ranges cover different residence types and should not be read as the size of an individual unit.
Reported amenities focus on wellness, recreation and community use, including a swimming pool, fitness centre or studio, spa facilities, private cinema room, residents’ lounge, children’s play areas and landscaped gardens with park access. The supplied material also lists BBQ and picnic areas, 24-hour concierge, valet and covered parking, and waterfront promenade access.
Approximate source-reported travel times place Etihad Arena around five minutes away, Yas Marina Circuit about seven minutes away, Ferrari World, Warner Bros. World, SeaWorld Abu Dhabi and Yas Mall around 10 to 12 minutes away, Zayed International Airport around 13 minutes away, and Saadiyat Cultural District about 25 minutes away. Freehold ownership is reported. Launch or market starting prices are cited from AED 2,200,000 to AED 2,300,000; the supplied structured details use AED 2,200,000 as the entry figure. A 40/60 payment schedule is reported as 5% down, 35% during construction and 60% at handover, with expected completion in Q4 2028. Price, terms and completion timing should be reconfirmed for the current release.
- Principal and Interest
- Property Tax
- HOA fee
- Private Mortgage Insurance




